One bathroom and a partially finished basement. It was only a matter of time. This year we decided it was time to do some remodeling on the house. By "some remodeling" I mean a whole lot of remodeling.
One bathroom and a partially finished basement. It was only a matter of time. This year we decided it was time to do some remodeling on the house. By "some remodeling" I mean a whole lot of remodeling.
If you're reading this Harmless Havoc has successfully been transferred to Windows Azure.
Cole let us sleep in this year: he got us out of bed at 6:30.
Some random shots of Halloween this year.
Today at work some of the design team was passing around an email about color, and someone linked to a color survey done a while back.
In August we took a trip to the east coast to see the sights and visit relatives. It’s been several years since we were out that way.
In June my band Squirrel of Shame spent a day at Egg Studios in Seattle.
April means the Easter Bunny, bad hats and flowers. As is our tradition, we headed out to northern Washington to view the tulips.